|
The Wilkes-Barre and Eastern Railroad (WB&E) was a railroad that operated in Pennsylvania from 1892 to 1939. ==History== The WB&E was a wholly owned subsidiary of the New York, Susquehanna and Western Railroad (NYS&W). It was chartered in 1892 to provide the NYS&W with a route to bring coal from the mines in northeastern Pennsylvania for delivery to the port of Edgewater, New Jersey. Previously, the NYS&W was contracting the coal haulage in Pennsylvania to the Delaware, Lackawanna and Western Railroad (DL&W). The DL&W originally hauled coal to their interchange with the NYS&W at Gravel Place, Pennsylvania. From there, the NYS&W would haul the coal to an interchange with the Pennsylvania Railroad in New Jersey. With the WB&E and exclusive control of distribution facilities at the port in Edgewater, the NYS&W had a direct way to move the coal from the mine to various markets without having to rely on (and pay) two additional railroads for haulage. About 15 miles east of Wilkes-Barre, the WB&E crossed the Panther Creek ravine over a spectacular 1,650-foot viaduct which stood 161 feet above the creek bed. It consisted of 20 iron towers and 42 spans, having 30-foot spans atop the towers, and 30- or 65-foot spans between towers. After some initial problems with the concrete tower foundations, the ironwork of the single-tracked bridge was erected in only six weeks and completed on August 3, 1893.〔The Foundations Of The Panther Creek Viaduct, Pennsylvania, USA, R. L. Harris, Minutes of proceedings of the Institution of Civil Engineers, Volume 118, Issue 1894, pages 349–355 (Google books )〕 In 1896, the WB&E created the Susquehanna Connecting Railroad to connect its main line with additional coal breakers in Minooka and Old Forge. The connection with the WB&E was at Paddy's Land, later renamed Suscon Junction. The Erie Railroad and the Delaware and Hudson Railway also connected with the line in Moosic, Pennsylvania. The WB&E was touted as the shortest route from the Scranton coalfields to the New York tidewater, being ten miles shorter than the shortest alternative route. However, its late entry into the region meant that the best routes were already taken, so the WB&E had grades and curves which limited the size and speed of its trains. After the Erie gained control of the NYS&W in 1898, it chose to divert traffic onto the Erie's Wyoming Division via the Susquehanna Connecting to Hillside Junction, and the WB&E eastward from Suscon slowly fell into disuse. Unable to pay the interest on its mortgage bonds, the WB&E filed for both bankruptcy in 1937. Local freight train service continued to operate on the line up to four times a week until abandonment in 1939. The Wilkes-Barre Connecting Railroad purchased the Susquehanna River bridge at Plains on August 1, 1940. Except for a small stub of track in Suscon, Pennsylvania and this bridge, nothing remains today of the WB&E. In actuality, there are several miles of track remaining along with several concrete structures and switches. The developer of Center Pointe East trade zone wants to restore rail service on this former line. 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Wilkes-Barre and Eastern Railroad」の詳細全文を読む スポンサード リンク
|